Plant & Equipment

Learn how to complete checklists, allocate workers and other plant and equipment processes.

Back to Training Hub

Frequently asked questions

Yes. Pre-starts can be completed externally and uploaded into HammerTech.

Yes, a piece of mobile plant can be linked to multiple projects at once.

Yes. This supports dry-hire arrangements.

No. Expired items are visible through dashboards and reports.

Yes.

Yes. However, they can not complete if they are not an inducted worker, don't have the relevant ticket uploaded in HammerTech and the item of plant they are being assigned to is not owned, or shared with the workers company.

No. SWMS signatures must be captured against the SWMS.

Yes. Only inducted workers with the relevant licencing will be visible to assign.

Yes. QR codes can be generated and printed from HammerTech. These can be at a project, or company level.

No. Plant must still be onboarded through BMD’s HammerTech environment.

Yes, where appropriately configured.

Yes. However, this should be managed by Subcontractors for their equipment in the first instance.

No. Follow normal change request processes to capture specific requirements.

Plant can be removed and re-added if required. If returning to a project, equipment should be re-inducted/ inspected.

Yes. Take photos of the equipment under the required fields. This shows the condition of the equipment when it arrived on BMD sites.